• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
PEP
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 38.961168 0.000000 $0.02 $0.62 -$0.60
Day 0.000000 935.068039 0.000005 $0.56 $14.88 -$14.32
Speculative
Week 0.000000 6,545.476271 0.000038 $3.95 $104.16 -$100.21
Month 0.000000 28,052.041161 0.000164 $16.93 $446.40 -$429.47
Historical
Last Hour 0.000000 34.958699 0.000000 $0.02 $0.62 -$0.60
Last Day 0.000000 935.068039 0.000005 $0.56 $14.88 -$14.32
Last 3 Days 0.000000 2,767.583083 0.000016 $1.67 $44.64 -$42.97
Last Week 0.000000 6,736.730832 0.000039 $4.07 $104.16 -$100.09
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
XeggeX 0.5852 sat 3.22 BTC 0.6214 sat 0.6149 sat 0.5804 sat
Nonkyc 0.5964 sat 0.09 BTC 0.6180 sat 0.6113 sat 0.5782 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 91.53 Gh/s Multi-coin pool 154
zpool Scrypt EU, US 1.00% 174.07 Gh/s Multi-coin pool 241