• Release date Aug 2022
  • ETH mining finished on 15th September 2022
  • Manufacturer page V1 Mini
  • Ethash4G 300.00 Mh/s @ 240W
  • Ethash 300.00 Mh/s @ 240W
Mh/s
EGAZ
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 3.496670 0.000000 $0.01 $0.02 -$0.01
Day 0.000000 83.920088 0.000003 $0.34 $0.58 -$0.23
Speculative
Week 0.000000 587.440615 0.000023 $2.40 $4.03 -$1.63
Month 0.000000 2,517.602636 0.000100 $10.29 $17.28 -$6.99
Historical
Last Hour 0.000000 3.692216 0.000000 $0.02 $0.02 -$0.01
Last Day 0.000000 83.920088 0.000003 $0.34 $0.58 -$0.23
Last 3 Days 0.000000 213.570594 0.000008 $0.87 $1.73 -$0.85
Last Week 0.000000 485.589715 0.000019 $1.99 $4.03 -$2.05
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Nonkyc 3.9615 sat 0.00 BTC 4.0288 sat 4.2371 sat 4.8509 sat
XeggeX 4.0133 sat 0.00 BTC 4.1514 sat 4.3414 sat 4.8858 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Comining.io EU, US, Asia 1.00% 33.37 Gh/s 77.5% 40
gtpool US, EU, Asia 1.00% 33.37 Gh/s 77.5% 40