• Release date Aug 2022
  • ETH mining finished on 15th September 2022
  • Manufacturer page Mini SE
  • Ethash4G 200.00 Mh/s @ 116W
  • Ethash 200.00 Mh/s @ 116W
Mh/s
BTN
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.174053 0.000000 $0.02 $0.01 $0.01
Day 0.000000 4.177280 0.000007 $0.45 $0.28 $0.17
Speculative
Week 0.000000 29.240957 0.000050 $3.13 $1.95 $1.18
Month 0.000000 125.318389 0.000215 $13.42 $8.35 $5.07
Historical
Last Hour 0.000000 0.171408 0.000000 $0.02 $0.01 $0.01
Last Day 0.000000 4.177280 0.000007 $0.45 $0.28 $0.17
Last 3 Days 0.000000 12.751400 0.000022 $1.37 $0.84 $0.53
Last Week 0.000000 28.498235 0.000049 $3.05 $1.95 $1.10
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
XeggeX 171.5096 sat 0.01 BTC 175.2742 sat 176.0366 sat 191.2192 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Ethash4G EU 0.50% 0.00 h/s Multi-coin pool 0
gtpool US, EU, Asia 1.00% 128.01 Gh/s 40.0% 188