• Release date Feb 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page Antminer S21+ Hydro
  • SHA-256 319.00 Th/s @ 4785W
Th/s
XEC
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 20,894.151056 0.000008 $0.78 $0.48 $0.30
Day 0.000000 501,459.625348 0.000181 $18.76 $11.48 $7.28
Speculative
Week 0.000000 3,510,217.377435 0.001268 $131.35 $80.39 $50.96
Month 0.000000 15,043,788.760437 0.005434 $562.94 $344.52 $218.42
Historical
Last Hour 0.000000 20,970.527103 0.000008 $0.78 $0.48 $0.31
Last Day 0.000000 501,459.625334 0.000181 $18.76 $11.48 $7.28
Last 3 Days 0.000000 1,507,001.380726 0.000544 $56.39 $34.45 $21.94
Last Week 0.000000 3,507,857.946888 0.001267 $131.26 $80.39 $50.88
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Binance 0.0361 sat 39.50 BTC 0.0371 sat 0.0372 sat 0.0375 sat
WhiteBIT 0.0361 sat 8.55 BTC 0.0371 sat 0.0372 sat 0.0375 sat
Mexc 0.0360 sat 1.21 BTC 0.0371 sat 0.0372 sat 0.0374 sat
Gate.io 0.0361 sat 0.89 BTC 0.0371 sat 0.0372 sat 0.0374 sat
CoinEx 0.0360 sat 0.77 BTC 0.0370 sat 0.0371 sat 0.0373 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
1pool US, EU, Asia 0.33% 4.85 Ph/s 3.1% 40
Zergpool SHA-256 EU 0.50% 627.88 Th/s Multi-coin pool 141
zpool SHA-256 EU, US 1.00% 1.07 Ph/s Multi-coin pool 150
Mining-Dutch EU 2.00% 5.93 Ph/s 3.7% 130
Viabtc CN 2.00% 90.06 Ph/s 56.9%