• Release date Mar 2025
  • This asic was recently released!
    All calculations are estimates. The profitability will likely change after more asics are delivered to users.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
CAT
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.673533 0.000001 $0.09 $0.62 -$0.53
Day 0.000000 16.164798 0.000022 $2.11 $14.88 -$12.77
Speculative
Week 0.000000 113.153584 0.000157 $14.75 $104.16 -$89.41
Month 0.000000 484.943932 0.000673 $63.21 $446.40 -$383.19
Historical
Last Hour 0.000000 0.824603 0.000001 $0.11 $0.62 -$0.51
Last Day 0.000000 16.164798 0.000022 $2.11 $14.88 -$12.77
Last 3 Days 0.000000 48.376582 0.000067 $6.31 $44.64 -$38.33
Last Week 0.000000 114.865461 0.000159 $14.97 $104.16 -$89.19
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Nonkyc 138.7079 sat 0.02 BTC 128.0256 sat 113.3201 sat 109.5515 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 0.00 h/s Multi-coin pool 0
zpool Scrypt EU, US 1.00% 0.00 h/s Multi-coin pool 0
Bowserlab Scrypt 1.00% 0.00 h/s Multi-coin pool 0
Mining-Dutch EU 2.00% 1.71 Th/s 111.9% 2368