• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
XVG
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.000000 0.000000 $0.00 $0.62 -$0.62
Day 0.000000 0.000000 0.000000 $0.00 $14.88 -$14.88
Speculative
Week 0.000000 0.000000 0.000000 $0.00 $104.16 -$104.16
Month 0.000000 0.000000 0.000000 $0.00 $446.40 -$446.40
Historical
Last Hour 0.000000 0.000000 0.000000 $0.00 $0.62 -$0.62
Last Day 0.000000 0.000000 0.000000 $0.00 $14.88 -$14.88
Last 3 Days 0.000000 0.000000 0.000000 $0.00 $44.64 -$44.64
Last Week 0.000000 0.000000 0.000000 $0.00 $104.16 -$104.16
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Binance 11.9133 sat 121.60 BTC 12.9492 sat 13.4387 sat 12.7953 sat
TradeOgre 12.0000 sat 0.02 BTC 12.8460 sat 13.0811 sat 12.2857 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
1pool US, EU, Asia 0.33% 22.59 Gh/s 63254.2% 23
Mining-Dutch EU 2.00% 38.38 Mh/s 107.5% 5